Anambah Urban Release Area

Town Planning

Anambah Urban Release Area

Project Location: Anambah Road, Anambah
Project Details: 480ha Site, Currently Rural Zoned Farm Land. Future yield of 3,500 lots (10,000 people)
Client Name: Stockland
Development Name: Anambah Urban Release Area (AURA)
Development Value: $300 million
Commenced: 2009
Duration: 25 years
Project Manager: Matt Owen

Project Management

  • Preparation of detailed estimates of development costs for numerous iterations of the masterplan;
  • Preparation and administration of project program;
  • Conduct presentations to MCC and DoPI.

Urban Design

  • Urban design of overall masterplan including retail site, residential, sporting fields, local playgrounds and riparian corridors.

Town Planning

  • Preparation of Structure Plan and Area Plan for whole release area;’
  • Preparation of draft S.94 contributions plan;
  • Organising and running community consultation sessions.

Engineering

  • Concept engineering design of main lead-in roads including culvert, crossing, sportsfields and lot benching.

Surveying 

  • Contour and detail survey of Stockland Land Holdings and lead-in road.


← Go Back

project gallery